High Voltage Transformer Including Voltage Optimization

Includes Metering with Remote Monitoring, and Reports

NZP Voltage Optimization

Typical Application

Customer owned primary transformer replacement typically 12.7-13.2V reduced to 480V.

High Voltage Transformer Including Voltage Optimization with Metering, and Remote Monitoring​

Performance

Voltage is optimized prior to distribution through a facility. kWh savings range between 5-19% depending on the type of electrical loads in the facility and existing site voltage. This solution captures savings for the entire facility. Metering provides real-time and historical data reports including: voltage, amperage, kWh consumption, savings, temperature, and power factor.

Facility Types

Any facility with customer owned primary transformer. Advantageous due to low installation cost and the additional savings above and beyond Voltage Optimization due to the Amorphous Core Transformer components (2%).

Utility Rate/ROI Sensitivity

Desirable ROI typically starts at around $.06 per kWh and up.

Size Range

kVakVakVakVakVakVakVa
5007501,0001,5002,0002,5003,000